Thursday, 25 January 2007 19:25

Critical Path

Written by
Rate this item
(0 votes)

The critical path is the longest path to completion in the network diagram. Activities on the critical path have no Slack or Float. The Project Time Management questions on the exam focus heavily on critical path method (CPM), and diagramming methods; the differences between these techniquees; and the appropriate circumstances for their use.

Last modified on Friday, 11 December 2009 01:26
Thursday, 25 January 2007 19:16

Activity Duration Estimating

Written by
Rate this item
(0 votes)

Duration includes the actual amount of time worked on an activity plus the elapsed time.

Effort is the number of workdays or work hours required to complete a task. Effort does not normally equal duration. People doing the work should help create estimates, and the PM should review them. Duration estimating is assessing the number of work periods (hours, days, weeks,) likely to be needed to complete each activity. Duration estimates always include some indication of the range of possible results, for example, 2 weeks + or – 2 days or 85% probability that the activity will take less than 3 weeks. Activity Duration Estimating:

Last modified on Friday, 11 December 2009 01:27
Thursday, 25 January 2007 19:06

Activity Resource Estimating

Written by
Rate this item
(0 votes)

This is the process of estimating how many resources a project team should use to perform project activities. Before estimating activity durations, the PM must have a good idea of the quantity and type of resources that will be assigned to each activity. Consider important issues in estimating resources:

  • How difficult will it be to complete specific activities on this project?
  • What is the organization’s history in doing similar activities?
  • Are the required resources available?
Last modified on Friday, 11 December 2009 01:28
Thursday, 25 January 2007 18:28

Scope Control

Written by
Rate this item
(0 votes)
The most prominent tool applied with scope change control is the Integrated Change Control System. Because changes are likely to happen within any project, there must be order to process, document, and manage the changes.

This system may include:

Last modified on Friday, 11 December 2009 00:41
Thursday, 25 January 2007 18:27

Scope Verification

Written by
Rate this item
(2 votes)

Scope verification is the process of formalizing acceptance of the project scope by the stakeholders. It requires reviewing work products and results to ensure that all were completed correctly and satisfactorily. Scope verification occurs at the end of each project phase, and as part of the project closeout process. Scope verification is concerned with stakeholder Acceptance of the work. Work is sometime denied and must be Re-Worked. 

Last modified on Friday, 11 December 2009 00:42

News and Promotions

Keep up to date with the latest happenings by signing up for our newsletter. Subscribe below.

Twitter Update

Who's Online

We have 497 guests and no members online

Got something to say?